All Issue

2017 Vol.54, Issue 1 Preview Page

Research Paper

28 February 2017. pp. 57-65
Abstract
References
1
Ahmadi, R., Hashemzadehfini, M. and Parian, M.A., 2013, "Rapid determination of Bond rod-mill work index by modeling the grinding kinetics," Advanced Powder Technology, Vol. 24, No. 1, pp. 441-445.
10.1016/j.apt.2012.10.003
2
Austin, L.G., Klimpel, R.R. and Luckie, P.T., 1984, Process engineering of size reduction: ball milling, 1st Ed., Vol. 1, Society of Mining Engineers of the American Institute of Mining, Metallurgical and Petroleum Engineers, New Jersey, United State of America, pp. 39-59.
3
Bond, F.C., 1961, "Crushing and grinding calculations," British Chemical Engineering, Vol. 6, No. 6, pp. 378-385.
4
Deniz, V., 2004, "Relationships between Bond's grindability (Gbg) and breakage parameters of grinding kinetic on limestone," Powder technology, Vol. 139, No. 3, pp. 208-213.
10.1016/j.powtec.2003.11.006
5
Deniz, V. and Umucu, Y., 2013, "Interrelationships between the Bond grindability with physicomechanical and chemical properties of coals," Energy Sources, Part A: Recovery, Utilization, and Environmental Effects, Vol. 35, No. 2, pp. 144-151.
10.1080/15567036.2010.504942
6
Ipek, H., Ucbas, Y. and Hosten, C., 2005, "The bond work index of mixtures of ceramic raw materials," Minerals Engineering, Vol. 18, No. 9, pp. 981-983.
10.1016/j.mineng.2004.12.014
7
Kutner, M.H., Nachtsheim, C. and Neter, J., 2004, Applied linear regression models, 4th Ed., Vol. 1, McGraw-Hill/ Irwin, pp. 384-480.
8
Lester, E., Kingman, S. and Dodds, C., 2005, "Increased coal grindability as a result of microwave pretreatment at economic energy inputs," Fuel, Vol. 84, No. 4, pp. 423-427.
10.1016/j.fuel.2004.09.019
9
Mosher, J. and Tague, C., 2001, "Conduct and precision of bond grindability testing," Minerals engineering, Vol. 14, No. 10, pp. 1187-1197.
10.1016/S0892-6875(01)00136-4
10
Mular, A.L. and Bhappu, R.B., 1980, Mineral processing plant design, 2rd Ed., Vol. 1, Society of Mining Engineers of the American Institute of Mining, Metallurgical, and Petroleum Engineers, pp. 239-278, 376-403.
11
Mular, A.L., Halbe, D.N. and Barratt, D.J., 2002, Mineral processing plant design, practice, and control proceedings, 1st Ed., Vol. 1, Society for Mining, Metallurgy, and Exploration, pp. 867-880.
12
Park, K.H., Mohapatra, D., Reddy, B.R. and Nam, C.W., 2007, "A study on the oxidative ammonia/ammonium sulphate leaching of a complex (Cu–Ni–Co–Fe) matte," Hydrometallurgy, Vol. 86, No. 3, pp. 164-171.
10.1016/j.hydromet.2006.11.012
13
Seo, J.H., Baek, C.S., Kwon, W.T., Ahn, J.W. and Cho, K.H., 2016, "Investigation of Bond's Work Index of Korean Desulfurization Limestone by Ball Mill," The Korean Society of Mineral and Energy Resources Engineers, Vol. 53, No. 2, pp. 130-139.
14
Sim, C.H., 2009, "Calculation of the Bond;s Grinding Work Index by Approximation Equation," The Korean Society of Mineral and Energy Resources Engineers, Vol. 46, No. 3, pp. 289-299.
Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society of Mineral and Energy Resources Engineers
  • Journal Title(Ko) :한국자원공학회지
  • Volume : 54
  • No :1
  • Pages :57-65
  • Received Date : 2016-12-12
  • Revised Date : 2017-02-27
  • Accepted Date : 2017-02-27